WQ95996 (e) Tabled on 11/03/2025

What is the estimated cost per driver of using the A465 Heads of the Valleys road in relation to its overall construction cost?

Answered by Cabinet Secretary for Transport and North Wales | Answered on 21/03/2025

I will write to you with a substantive response and a copy of the letter will be published on the internet.