WQ92158 (e) Tabled on 18/03/2024

What is the anticipated cost of the upkeep and maintenance of the overhead wiring on the new Transport for Wales metro lines?

Answered by Cabinet Secretary for North Wales and Transport | Answered on 27/03/2024

Once the overhead line equipment is fully energised and operational, Transport for Wales anticipate a full-year maintenance cost to be of c. £600k (in 2023/24 prices).