WAQ71325 (e) Tabled on 24/10/2016

What information about the use of the Port Talbot peripheral distributor road has the Welsh Government received during the closure of Junction 41 of the M4?

Answered by Cabinet Secretary for Economy and Infrastructure | Answered on 01/11/2016

The evaluation report into the trial closure provides the data and analysis requested. The report is available at the following link:

http://gov.wales/docs/det/report/150608-m4j41-trial-closure-evaluation-en.pdf