WQ90514 (e) Tabled on 18/01/2024

Will the Minister confirm how many properties are in the transport Operational Network portfolio, and provide a breakdown of the properties?

Answered by Deputy Minister for Climate Change | Answered on 26/01/2024

Welsh Government Transport maintain a number of specialist buildings across Wales in order to safely operate the strategic road network.

Namely:

2 traffic management centres (TMC) – part of the WG core estate

2 disaster recovery buildings used for TMC backup – one north, one south

1 gatehouse, Menai bridge

18 Transmission Buildings – used to house IT equipment at the roadside, various sizes

11 Tunnel Service buildings – Used to house tunnel operating equipment alongside the tunnels

11 Highways Depots – used for Salt storage and operational requirements for the SRN maintenance