WQ88034 (e) Tabled on 21/04/2023

Will the Minister outline the total cost spent on the temporary traffic lights currently in place across the bridge over the A55 trunk road on Sea Road, Abergele, since their installation?

Answered by Deputy Minister for Climate Change | Answered on 03/05/2023

The traffic lights on Sea Road were installed as a permanent installation in 2010 in order to keep the bridge open until the completion of the bridge structural repairs and drainage issues on the A55 below the bridge. 

The total cost for their installation was £59,265.80.

The ongoing maintenance and hire costs associated with the safety barriers across the bridge is £107,036.83