WQ83457 (e) Tabled on 24/09/2021

What mitigating actions does the Minister require local authorities in receipt of active travel funding to take to ensure the safety of users on shared paths?

Answered by Deputy Minister for Climate Change | Answered on 05/10/2021

Schemes in receipt of active travel funding need to comply with the Active Travel Act Guidance.  Sections 11.14 and 11.16 set out the considerations that need to be taken into account when planning a shared use path.  The dimensions and considerations that need to be taken into account are also included in Appendix G for each specific design element.  Local authorities need to consult on schemes pre-installation, and monitor post-installation to identify if any mitigation measures are required.