WAQ79153 (e) Tabled on 26/11/2019

Will the Minister confirm whether all incinerators are required to have an environment impact assessment before planning permission is given?

Answered by Deputy Minister for Housing and Local Government | Answered on 04/12/2019

Incinerators which fall within a project description set out in Schedule 1 to the Town and Country Planning (Environmental Impact Assessment) always require environmental impact assessment (EIA).  Those which fall within a project description set out in Schedule 2 to the regulations require EIA if they are likely to have significant effects on the environment.