WAQ73339 (w) Tabled on 04/04/2017

What are the costs and timetable of the scheme referred to by the First Minister in response to an oral question on 4 April in Plenary of implementing improvements to congestion on the A470? W

Answered by Cabinet Secretary for Economy and Infrastructure | Answered on 18/04/2017

We are currently in the early stages of developing and implementing a programme of work to address congestion pinchpoints on the trunk road network across Wales. The programme will also provide safe overtaking opportunities in Mid Wales.

As part of this programme a corridor study is currently underway on the A470 to identify problem areas and the work required to address them. At this stage therefore it is not possible to provide details of specific schemes or the timetable for their delivery